Uninterruptible power supply Pixietech On-line, 3:1 phase, rack, 20 kVA
Pixietech In stock

Uninterruptible power supply Pixietech On-line, 3:1 phase, rack, 20 kVA

PXT-UPS-IHRT-31-20-XL

Pixietech On-line 20 kVA UPS, 3-phase input / 1-phase output, rack, without batteries for sites with a three-phase supply and single-phase loads. Buy in Tashkent.

28 992 900 UZS
Type
UPS
Part number
PXT-UPS-IHRT-31-20-XL
Warranty
1 year
Power output
20 kVA
Specifications
Type
UPS
Part number
PXT-UPS-IHRT-31-20-XL
Warranty
1 year
Power output
20 kVA
Topology
On-line (double conversion)
Form factor
Rack-mount (rack)
Phases (input:output)
3:1

Pixietech On-line uninterruptible power supply, 20 kVA with 3-phase input and 1-phase output (3:1), rack form factor, without battery — a professional solution for sites with a three-phase input and single-phase consumers. The UPS converts three-phase power from the industrial grid into stable single-phase voltage, protecting equipment from all types of mains disturbances. The rack form factor ensures convenient integration into server infrastructure.

Advantages

  • 3:1 configuration (three phases at input, one at output): an optimal solution for sites with three-phase input and single-phase servers
  • 20 kVA power: protection of large-scale server infrastructure with high power consumption
  • Rack mounting: integration into standard 19-inch server cabinets
  • Battery-free version: ability to connect external battery cabinets for the required backup time
  • On-line topology: zero transfer time and full filtering of mains disturbances
  • 1-year warranty: manufacturer's warranty service

Applications

  • Large corporate data centers and server halls with three-phase power supply
  • Manufacturing enterprises with server infrastructure connected to the industrial grid
  • Telecom nodes of communication operators and providers
  • Banks and financial organizations with high-availability requirements
  • Government facilities and large institutions with powerful IT infrastructure

Frequently asked questions

Why is a 3:1 configuration needed instead of a regular 1:1?
A three-phase input allows the load to be evenly distributed across the phases of the industrial grid and reduces the current on each phase, which is especially important for sites with industrial power supply.
Why is the model supplied without batteries?
At high power, battery cabinets are required to provide sufficient backup runtime — the battery-free version allows the optimal battery capacity to be selected separately.
Can this UPS be purchased and installed in Tashkent?
Yes, SAT Solutions supplies and installs this equipment at sites in Tashkent and throughout Uzbekistan.
🛠Turnkey serviceServer Rooms & Data Centers in Tashkentdesign and installation
💬
Need help choosing?
Our engineer will pick the right equipment for your needs and send a quote within one business day.
Get a consultation

Product reviews

Rate our work
Tap the stars

Questions & answers

Ask the engineer

Compatibility, installation, selection — we'll answer and publish the reply on this page.